OCTO+
INSTALLATION & COMMISSIONING MANUAL.
This manual covers the installation and commissioning of a complete OCTO+ system, excluding the communications system.
KEY FEATURES: 1 to 4 loops panel; Chameleon Peer-to-Peer Advance; Networking Protocol up to 32 Nodes; Up to 250 devices per loop (only 125 addresses); Connection via RS422, Fibre-Optic or TCP/IP(in dev); Full Self-Addressable Devices support; Available only with ZEOS protocol; Programming by integrated keypad or Loader PC software; Multiple language support (Arabic, Hindu,Farsi).
GEKKO
INSTALLATION & COMMISSIONING MANUAL.
This manual covers the installation and commissioning of a complete GEKKO system, excluding the communications system.
KEY FEATURES: 1 to 4 loops panel; Networkable panel, compatible with OCTO+, NODE+ and CHAMELEON REP; Up to 250 devices per loop ( only 125 addresses ); Connection via RS422, Fibre-Optic or TCP/IP (in dev.); Full Self-Addressable Devices support; Available only with ZEOS protocol; Programming by integrated keypad or Loader PC software; Multiple language support (menu selectable).
CHAMELEON NETWORK
INSTALLATION & COMMISSIONING MANUAL.
This manual not only describes the components and connections during installation, but will also assist in commissioning and maintenance of our systems.
KEY FEATURES: “Multi master” approach (independent panels with global system awareness); Customer configuration broadcasted to all panels over the Chameleon network; Maximum of 32 panels; System Repeaters via RS422, Fibre-Optics, Serial and TCP/IP.